TM-9-2320-366-34-1 MTV Direct Maintenance Manual M1083 Series - Volume 1 Download
Page 1242 of 1591
Change 1 2-1072.11 TM 9-2320-366-34-1 OPERATIONAL TEST (1) Attempt to lower dump body (TM 9-2320-366-10-1). (2) If dump body does not lower, replace dump body hoist cylinder (para 17-4). (3) If dump body does lower, fault corrected. PRESSURE TEST (1) Perform pressure reducing valve adjustment (para 17-3). (2) If pressure reducing valve cannot be adjusted to 325-375 PSI, clean or replace presuure reducing valve (para 17-3).