TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download

Page 79 of 1158

TM 9-2320-366-20-5 17-12. M1089 HOIST CABLE REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions MHC erected over tool box (TM 9-2320-366-10-2). Hook block assembly removed (para 17-4). Hoist cable fully payed out (TM 9-2320-366-10-2). Engine shut down (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Gloves, Welders (Item 14, Appendix C) Personnel Required (2) WARNING Cable can become frayed or contain broken wires. Wear heavy leather-palmed gloves when handling cable. Frayed or broken wires can injure hands. Failure to comply may result in injury to personnel. a. Removal. (1) Drive cable wedge (1) and cable (2) out of sleeve (3). (2) Pull cable (2) from sleeve (3). (3) Remove cable (2) from drum (4). b. Installation. (1) Route cable (1) over and around drum (2). (2) Insert cable (1) through slot (3) in side of drum (2). (3) Route cable (1) up through sleeve (4) and back down into sleeve, making a loop. 17-43