TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download
Page 660 of 1158
TM 9-2320-366-20-5  20-438 Change 2  20-75. M1085 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT INSTALLATION/  REMOVAL (CONT)  (14) Install clamp (19) on frame rail (18) and subframe  rail (20) with spacer (21), tie-rod (22), and two self-  locking nuts (23).  (15) Perform step (14) on right clamp.  (16) Position S-280 shelter (24) on cargo bed (25).  CAUTION  WARNING  Ensure at least two whole threads are  showing past nuts after installation. Failure  to comply may result in damage to  equipment.  NOTE  Left and right clamps are installed the same  way. Left clamp shown.  S-280 shelter weighs approximately 1500  lbs (680 kgs) empty. Attach a suitable  lifting device prior to installation. Failure  to comply may result in serious injury or  death to personnel or damage to  equipment.  NOTE  Steps (16) through (23) require the aid of an  assistant.