TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download
Page 657 of 1158
TM 9-2320-366-20-5 Change 2 20-435 20-75. M1085 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT INSTALLATION/ REMOVAL This task covers: a. Installation b. Removal c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Cargo bed side panels and stakes removed (TM 9-2320- 366-10-1). Tools and Special Tools Drill set, Twist (Item 8, Appendix C) Drill, Portable, Electric (Item 7, Appendix C) Tap, Thread, Cutting (Item 41.3, Appendix C) Tap and Die Set (Item 41.2, Appendix C) Tool Kit, Genl Mech (Item 46, Appendix C) Sling, Cargo (2) (Item 31, Appendix C) Materials/Parts Nut, Self-Locking (4) (Item 159, Appendix G) Lockwasher (8) (Item 73.1, Appendix G) Personnel Required (2) a. Installation. (1) Measure and mark a line (1) 1.25 in (32 mm) down from upper RH corner of tiedown bracket (2). (2) Measure and mark a line (3) 4.4 in (109 mm) from RH side of line (1). (3) Measure and mark a line (4) 4.72 in (120 mm) from RH side of line (3). NOTE Overall height for shelter models A, B, or C is 83 1/2 to 89 in. (214 to 226 cm). If shelter height is below 83 1/2 in. (214 cm), shorten cable to remove slack in turnbuckle assembly. NOTE • Perform steps (1) through (6) on tiedowns not originally modified. • All tiedowns are modified the same way. RH front tiedown shown. • Measurements will be taken from upper LH corner on LH tiedown bracket.