TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download
Page 647 of 1158
TM 9-2320-366-20-5 Change 2 20-431 (21) Install clamp (27) on frame rail (26) and subframe rail (28) with spacer (29), tie-rod (30), and two self- locking nuts (31). (22) Perform step (21) on right clamp. CAUTION Ensure at least two whole threads are showing past nuts after installation. Failure to comply may result in damage to equipment. NOTE Left and right clamps are installed the same way. Left clamp shown.