TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download

Page 643 of 1158

TM 9-2320-366-20-5 Change 2 20-427 20-74. M1083/M1093 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT INSTALLATION/REMOVAL This task covers: a. Installation b. Removal c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Cargo bed side panels and stakes removed (TM 9-2320- 366-10-1). Tools and Special Tools Drill Set, Twist (Item 8, Appendix C) Drill Portable, Electric (Item 7, Appendix C) Tool Kit, Genl Mech (Item 46, Appendix C) Sling, Cargo (2) (Item 31, Appendix C) Tap, Thread, Cutting (Item 41.3, Appendix C) Tap and Die Set (Item 41.2, Appendix C) Materials/Parts Nut, Self-Locking (4) (Item 159, Appendix G) Lockwasher (24) (Item 73.1, Appendix G) Personnel Required (2) a. Installation. (1) Measure and mark a line (1) 1.76 in. (45 mm) from corner of tiedown bracket (2). (2) Measure and mark a line (3) 1.76 in. (45 mm) from end of tiedown (2). (3) Transfer line (4) from line (3), line (1), and to the side of tiedown bracket (2) NOTE Overall height of shelter models A, B, and C is 83 1/2 to 89 in. (214 to 226 cm). If shelter height is less than 83 1/2 in. (214 cm), shorten cable to remove slack in turnbuckle. NOTE Perform steps (1) through (3) on tiedowns not originally modified.