TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download
Page 628 of 1158
TM 9-2320-366-20-5 20-73. M1085 COLLAPSIBLE DRUMS TIEDOWN KIT INSTALLATION/REMOVAL (CONT) WARNING Ensure cargo bed is free of equipment and debris and not warped or damaged. Failure to comply may result in serious injury or death to personnel or damage to equipment. (41) Remove four quick release pins (85) and plugs (86) from crane pocket (87). (42) Install four tiedown posts (88) in crane pockets (87). CAUTION Ensure quick release pins are installed through both sides of crane pockets. Failure to comply may result in damage to equipment. (43) Install four plugs (86) on frame (89) with four quick release pins (85). (44) Position four tiedown hoist rings (90) on tiedown posts (88) with screws (91). (45) Tighten four screws (91) to 230 lb-ft (312 N·m). (46) Lower ladder (TM 9-2320-366-10-1). 20-412