TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download

Page 624 of 1158

TM 9-2320-366-20-5 20-73. M1085 COLLAPSIBLE DRUMS TIEDOWN KIT INSTALLATION/REMOVAL (CONT) (4) Position clamp half (7) in chain (4). (5) Position clamp half (8) in shock mount (9). (6) Install clamp half (7) in clamp half (8) with spring collar (10) and pin (11). (7) Position clamp half (12) in shock mount (9). (8) Position clamp half (13) in turnbuckle (14). (9) Install clamp half (12) in clamp half (13) with spring collar (15) and pin (16). (10) Perform steps (1) through (9) on remaining rear middle chain. NOTE • Front middle chains are assembled the same way. One front middle chain shown. • Steps (11) through (15) requires 39 link chain. (11) Position clamp half (17) in hook (18). (12) Position clamp half (19) in chain (20). (13) Install clamp half (17) in clamp half (19) with spring collar (21) and pin (22). 20-408