TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download

Page 584 of 1158

TM 9-2320-366-20-5 20-66. LIGHT MATERIAL HANDLING CRANE (LMHC) TURRET REPLACEMENT (CONT) b. Installation. (1) Position turret (1) on mast (2). (2) Install quick release pin (3) in turret (1). WARNING Light Material Handling Crane (LMHC) boom assembly weighs approximately 150 lbs (68 kgs). Use the aid of assistant when installing boom assembly. Failure to comply may result in injury to personnel. NOTE Steps (3) and (4) require the aid of an assistant. (3) Install boom assembly (4) on turret (1). (4) Install quick release pin (5) in boom assembly (4). c. Follow-On Maintenance. (1) Install LMHC remote control unit cable (TM 9-2320-366- 10-1). (2) Install LMHC power cable (TM 9-2320-366-10-1). (3) Operate LMHC and check for proper operation (TM 9- 2320-366-10-1). End of Task. 20-368