TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download
Page 583 of 1158
TM 9-2320-366-20-5 20-66. LIGHT MATERIAL HANDLING CRANE (LMHC) TURRET REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). LMHC power cable removed (TM 9-2320-366-10-1). LMHC remote control cable removed (TM 9-2320-366- 10-1). Personnel Required (2) a. Removal. WARNING Light Material Handling Crane (LMHC) boom assembly weighs approximately 150 lbs (68 kgs). Use an assistant when removing boom assembly. Failure to comply may result in injury to personnel. NOTE Steps (1) and (2) require the aid of an assistant. (1) Remove quick release pin (1) from turret (2). (2) Remove boom assembly (3) from turret (2). (3) Remove quick release pin (4) from turret (2). (4) Remove turret (2) from mast (5). 20-367