TM-9-2320-366-20-5 MTV Unit Maintenance Manual M1083 Series - Volume 5 Download

Page 547 of 1158

TM 9-2320-366-20-5 20-60. LIGHT MATERIAL HANDLING CRANE (LMHC) ASSEMBLY/DISASSEMBLY This task covers: a. Assembly b. Disassembly INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Sling, Cargo (Item 31, Appendix C) Materials/Parts Lockwasher (2) (Item 96, Appendix G) Personnel Required (2) a. Assembly. NOTE LMHC may be installed in any of the four cargo bed pockets. Left front cargo bed pocket shown. (1) Remove quick release pin (1) and plug (2) from cargo bed pocket (3). WARNING Light Material Handling Crane (LMHC) mast weighs approximately 110 lbs (50 kgs). Attach a suitable lifting device prior to installation. Failure to comply may result in injury to personnel or damage to equipment. NOTE • Step (2) requires the aid of an assistant. • Position mast in cargo bed so handle does not extend over front or rear edge of cargo bed. (2) Install mast (4) in cargo bed pocket (3). 20-331