TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download
Page 814 of 1558
TM 9-2320-366-20-4  11-29. PRESSURE PROTECTION VALVE REPLACEMENT  This task covers:  a. Pressure Protection Valve Removal (All Models  Except M1089/M1090/M1094)  b. Pressure Protection Valve Installation (All  Models Except M1089/M1090/M1094)  c. M1089 Pressure Protection Valve Removal  d. M1089 Pressure Protection Valve Installation  e. M1090/M1094 Pressure Protection Valve Removal  f. M1090/M1094 Pressure Protection Valve Installation  g. Follow-On Maintenance  INITIAL SETUP  Equipment Conditions  Engine shut down (TM 9-2320-366-10-1).  Air tanks drained (TM 9-2320-366-10-1).  Tools and Special Tools  Tool Kit, Genl Mech (Item 46, Appendix C)  Materials/Parts  Dispenser, Pressure Sensitive Adhesive Tape (Item  20, Appendix D)  Antiseize Compound (Item 58, Appendix D)  a. Pressure Protection Valve Removal (All Models  Except M1089/M1090/M1094).  NOTE  Tag air hoses and connection points prior to  disconnecting.  (1) Disconnect air hose (1) from fitting (2).  (2) Disconnect air hose (3) from 90-degree fitting (4).  (3) Rotate pressure protection valve (5) to vertical position.  (4) Remove pressure protection valve (5) from 90-degree  fitting (6).  (5) Remove 90-degree fitting (6) from air tank (7).  11-170 Change 1