TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download
Page 747 of 1558
TM 9-2320-366-20-4 11-20. SYSTEM PARK AND TRAILER AIR SUPPLY VALVES REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Air tanks drained (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Materials/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 20, Appendix D) Antiseize Compound (Item 58, Appendix D) a. Removal. (1) Remove two roll pins (1) and knobs (2) from TRAILER AIR SUPPLY valve (3) and SYSTEM PARK valve (4). (2) Remove two nuts (5) from TRAILER AIR SUPPLY valve (3) and SYSTEM PARK valve (4). (3) Remove six screws (6) and panel (7) from personnel heater assembly (8). Change 1 11-113