TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download
Page 700 of 1558
TM 9-2320-366-20-4 11-11. LOAD AVERAGING CHANNEL REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Air tanks drained (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Goggles, Industrial (Item 15, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C) Materials/Parts Adhesive (Item 4, Appendix D) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Removal. (1) Remove screw (1) and load sensing valve control cable (2) from load averaging channel (3). 11-70