TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download

Page 688 of 1558

TM 9-2320-366-20-4 11-10. LOAD SENSING VALVE AND CONTROL CABLE REPLACEMENT/ADJUSTMENT (CONT) (4) Remove screw (5) and load sensing valve control cable (4) from load averaging channel (6). b. Load Sensing Valve Control Cable Installation. WARNING Adhesive Sealant MIL-S-46163 can damage your eyes. Wear safety goggles/glasses when using; avoid contact with eyes. If sealant contacts eyes, flush eyes with water and get immediate medical attention. Failure to comply may result in injury to personnel. (1) Apply adhesive to threads of screw (1). (2) Position load sensing valve control cable (2) on load averaging channel (3) with screw (1). (3) Tighten screw (1) to 25-31 lb-ft (34-42 N·m). 11-58 Change 1