TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download

Page 620 of 1558

TM 9-2320-366-20-4 10-5. REAR AXLE BOGIE SERVICE This task covers: a. Draining b. Filling c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C) Pan, Drain (Item 24, Appendix C) Goggles, Industrial (Item 15, Appendix C) Material/Parts Sealing, Compound (Item 57, Appendix D) Oil, Lubricating, Gear, GO 75W (Item 39, Appendix D) Sealing Compound (Item 55, Appendix D) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Draining. NOTE Left and right bogie covers are removed the same way. Left cover shown. (1) Match mark cover (1) to bogie housing (2). (2) Place drain pan under bogie housing (2). (3) Remove six screws (3) and cover (1) from bogie housing (2). 10-20