TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download

Page 232 of 1558

TM 9-2320-366-20-4 7-112. M1089 HOIST UP LOCKOUT SOLENOID CABLE REPLACEMENT (CONT) b. Installation. (1) Install hoist up lockout solenoid cable (1) through compression nut (2), washer (3), and connector (4). (2) Install compression nut (2) on connector (4). (3) Install quick disconnect terminal (5) on black wire (6). (4) Install terminal lug (7) on white wire (8). (5) Install quick disconnect terminal (5) on ground strip (9) position 8. (6) Install terminal lug (7) on terminal block (10) position 19 with screw (11). (7) Apply varnish to quick disconnect terminal (5) and terminal lug (7). 7-564