TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download
Page 212 of 1558
TM 9-2320-366-20-4 7-107. M1089 BOOM UP LOCKOUT SOLENOID CABLE REPLACEMENT (CONT) b. Installation. (1) Install boom up lockout solenoid cable (1) through compression nut (2), washer (3), and connector (4). (2) Install compression nut (2) on connector (4). (3) Install quick disconnect terminal (5) on black wire (6). (4) Install terminal lug (7) on white wire (8). (5) Install quick disconnect terminal (5) on ground strip (9) position 19. (6) Install terminal lug (7) on terminal block (10) position 19 with screw (11). (7) Apply varnish to quick disconnect terminal (5) and terminal lug (7). 7-544