TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download
Page 204 of 1558
TM 9-2320-366-20-4 7-105. M1089 BOOM DOWN LOCKOUT SOLENOID CABLE REPLACEMENT (CONT) b. Installation. (1) Install boom down lockout solenoid cable (1) through compression nut (2), washer (3), and connector (4). (2) Install compression nut (2) on connector (4). (3) Install quick disconnect terminal (5) on black wire (6). (4) Install terminal lug (7) on white wire (8). (5) Install quick disconnect terminal (5) on ground strip (9) position 20. (6) Install terminal lug (7) on terminal block (10) position 19 with screw (11). (7) Apply varnish to quick disconnect terminal (5) and terminal lug (7). 7-536