TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download

Page 1240 of 1558

TM 9-2320-366-20-4 16-23. M1089 TOOL BOX REPLACEMENT/REPAIR (CONT) NOTE Perform steps (19) and (20) on front tool box. (19) Remove nut (36) and bracket (37) from tool box (38). WARNING Towbar weighs approximately 150 lbs (68 kgs). Attach a suitable lifting device prior to removal. Failure to comply may result in injury to personnel or damage to equipment. NOTE Step (20) requires the aid of two assistants. (20) Remove nut (39) and towbar (40) from tool box (38). NOTE Steps (21) and (22) require the aid of an assistant. (21) Remove eight self-locking nuts (41), 16 washers (42), and eight screws (43) from tool box (10). Discard self- locking nuts. 16-170 Change 1