TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download

Page 112 of 1558

TM 9-2320-366-20-4 7-87. M1084/M1086 BOOM UP LOCKOUT SOLENOID CABLE REPLACEMENT (CONT) b. Installation. (1) Position boom up lockout solenoid cable (1) through clamp (2). (2) Position boom up lockout solenoid cable (1) through compression nut (3), washer (4), and connector (5). (3) Install washer (4) and compression nut (3) on connector (5). (4) Tighten nut (6) on clamp (2). (5) Install quick disconnect terminal (7) on black wire (8). (6) Install terminal lug (9) on white wire (10). (7) Install quick disconnect terminal (7) on ground strip (11) position 15. (8) Install terminal lug (9) on terminal block (12) position 28 with screw (13). (9) Apply varnish to quick disconnect terminal (7) and terminal lug (9). 7-440