TM-9-2320-366-20-4 MTV Unit Maintenance Manual M1083 Series - Volume 4 Download
Page 104 of 1558
TM 9-2320-366-20-4 7-85. M1084/M1086 BOOM DOWN LOCKOUT SOLENOID CABLE REPLACEMENT (CONT) b. Installation. (1) Position boom down lockout solenoid cable (1) through clamp (2). (2) Position boom down lockout solenoid cable (1) through compression nut (3), washer (4), and connector (5). (3) Install washer (4) and compression nut (3) on connector (5). (4) Tighten nut (6) on clamp (2). (5) Install quick disconnect terminal (7) on two black wires (8). (6) Install terminal lug (9) on white wire (10). (7) Install quick disconnect terminal (7) on ground strip (11) position 13. (8) Install terminal lug (9) on terminal block (12) position 28 with screw (13). (9) Apply varnish to quick disconnect terminal (7) and terminal lug (9). 7-432