TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 963 of 1396
TM 9-2320-366-20-3 7-36. BACKUP LIGHT ASSEMBLY REPLACEMENT/REPAIR This task covers: a. M1088 Backup Light Assembly Removal b. M1088 Backup Light Assembly Installation c. M1089 Backup Light Assembly Removal d. M1089 Backup Light Assembly Installation e. Deleted f. Deleted g. M1083/M1084/M1085/M1086/M1090/M1092/M10 93/M1094/M1096 Backup Light Assembly Removal h. M1083/M1084/M1085/M1086/M1090/M1092/M10 93/M1094/M1096 Backup Light Assembly Installation i. Disassembly j. Assembly k. Follow-On Maintenance INITIAL SETUP Equipment Conditions Batteries disconnected (para 7-57). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C) Materials/Parts Lockwasher (2) (Item 96, Appendix G) Lockwasher (4) (Item 114, Appendix G) Packing, Preformed (Item 215, Appendix G) Nut, Self-Locking (4) (Item 168, Appendix G) a. M1088 Backup Light Assembly Removal. (1) Disconnect backup light connector (1) from connector P87 (2). (2) Remove two screws (3), lockwashers (4), terminal lug TL17 (5), and backup light assembly (6) from bracket (7). Discard lockwashers. b. M1088 Backup Light Assembly Installation. (1) Position terminal lug TL17 (5), two lockwashers (4), screws (3), and backup light assembly (6) on bracket (7). (2) Tighten two screws (3) to 19-24 lb-ft (26-32 N·m). (3) Connect connector P87 (2) to backup light connector (1). Change 1 7-211