TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download

Page 895 of 1396

TM 9-2320-366-20-3 Change 2 7-150.1/(7-150.2 Blank) (11) Install ground strip (30) on junction box (2) with two screws (31), nylon washers (32), washers (33), lockwashers (34), and nuts (35). (12) Connect two quick disconnect terminals (36) to ground strip (30) positions 19 and 20. (12.1) Install bracket (36.1) on junction box (2) with two rivets (36.2). (12.2) Install lockout relay (36.3) and shutdown relay (36.4) on bracket (36.5) with screw (36.6), washer (36.7), lockwasher (36.8), and nut (36.9). (12.3) Connect lockout relay connector (36.10) to lockout relay (36.3). (12.4) Connect shutdown relay connector (36.11) to shutdown relay (36.4). NOTE Perform steps (12.1) through (12.4) on junction boxes that have had modification kit installed.