TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 851 of 1396
TM 9-2320-366-20-3 Change 2 7-109 (16) Connect connector (29) to OIL PRESS gage connector (30). (17) Connect connector clamp (31) on OIL PRESS gage connector (30). (18) Perform steps (16) and (17) on remaining electrical gages. (19) Connect connector PX7 (32) to lighted indicator display (33). (20) Position instrument panel assembly (1) on dashboard (2) with 16 washers (34) and screws (35). (21) Tighten 16 screws (35) to 24 lb-in. (3 N•m). (22) Install HAND THROTTLE knob (36) on HAND THROTTLE lever (37) with screw (38). e. Follow-On Maintenance. (1) Install steering wheel (para 13-2). (2) Connect batteries (para 7-57). (3) Start engine (TM 9-2320-366-10-1). (4) Check operation of instrument panel assembly switches and gages (TM 9-2320-366-10-1). (5) Shut down engine (TM 9-2320-366-10-1). End of Task. NOTE All electrical gages are connected the same way. OIL PRESS gage shown. Refer to Table 7-1.2 Electrical Gages Connectors for correct combinations of gages and connectors. NOTE Depending upon pre-conditioned items removed; configuration of the instrument panel can have from 12 to 16 screws. Configuration with 6 screws shown.