TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download

Page 774 of 1396

TM 9-2320-366-20-3 7-36 Change 2 d. Installation. (1) Install decal (1) on auxiliary panel housing (2). (2) Route auxiliary panel cable assembly (3) in auxiliary panel housing (2). (3) Position auxiliary panel housing (2) on heater assembly (4) with eight screws (5). (4) Tighten eight screws (5) to 35-44 lb-in. (4-5 Nm). (4.1) Route connector J925 (5.1) auxiliary panel jumper cable assembly (3) in auxiliary panel housing (2). (4.2) Connect connector P925 (5.3) to connector J925 (5.1) (5) Position tachometer (6) in auxiliary panel (7) with retaining ring (8) and two self-locking nuts (9). (6) Tighten two self-locking nuts (9) to 9 lb-in. (1 Nm). (7) Install two protective caps (10) on tachometer (6). (8) Connect connector P901 (11) to tachometer connector (12). (9) Connect connector clamp (13) on tachometer connector (12). NOTE Perform steps (4.1) and (4.2) on models M1090 and M1094.