TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 750 of 1396
TM 9-2320-366-20-3 7-4. ALTERNATOR BRACKETS REPLACEMENT This task covers: a. Support Brackets Removal b. Support Brackets Installation c. Belt Take-Up Bracket Removal d. Belt Take-Up Bracket Installation e. Follow-On Maintenance INITIAL SETUP Equipment Conditions 100 amp alternator removed, if equipped (para 7-2). 200 amp alternator removed, if equipped (para 20-45). Tools and Special Tools Goggles, Industrial (Item 15, Appendix C) Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C) Gage, Belt Tension (Item 19, Appendix B) Material/Parts Sealing Compound (Item 57, Appendix D) Nut, Self-Locking (Item 167, Appendix G) Personnel Required (2) a. Support Brackets Removal. NOTE Note location of different size screws for installation. (1) Remove two screws (1), washers (2), and belt adjusting arm (3) from alternator bracket (4). 7-14