TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 521 of 1396
TM 9-2320-366-20-3 3-6. ENGINE AND TRANSMISSION OIL SAMPLING VALVES REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Engine shut down (TM 9-2320-366-10-1). Cab raised (TM 9-2320-366-10-1). Tools and Special Tools Goggles, Industrial (Item 15, Appendix C) Pan, Drain (Item 24, Appendix C) Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C) Wrench Set, Socket (Item 51, Appendix C) Materials/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 20, Appendix D) Packing, Preformed (Item 186, Appendix G) Antiseize Compound (Item 58, Appendix D) WARNING Wear appropriate eye protection when working under vehicle due to the possibility of falling debris. Failure to comply may result in injury to personnel. a. Removal. (1) Position drain pan under transmission oil sampling valve (1) and engine oil sampling valve (2). NOTE Tag hoses and connection points prior to disconnecting. (2) Disconnect transmission oil sampling hose (3) from transmission oil sampling valve (1). (3) Disconnect engine oil sampling hose (4) from engine oil sampling valve (2). (4) Remove nut (5) and transmission oil sampling valve (1) from bracket (6). (5) Remove nut (7) and engine oil sampling valve (2) from bracket (6). Change 1 3-15