TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 512 of 1396
TM 9-2320-366-20-3 3-3. VALVE COVER AND GASKET REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Charge air cooler to air inlet elbow tubes/hoses removed (para 4-5). Tool and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C) Socket Set, Socket Wrench (Item 36, Appendix C) Materials/Parts Rag, Wiping (Item 50, Appendix D) Sealing Compound (Item 59, Appendix D) Gasket (for valve cover 7W5627) (Item 42, Appendix G) Gasket (for valve cover 119-2960) (Item 28, Appendix G) Adhesive (Item 6, Appendix D) Screw, Cap (14) (for replacement of valve cover 7W5627 with valve cover 119-2960) (Item 262, Appendix G) a. Removal. NOTE Position hoses to allow access to valve cover. (1) Remove screw (1), washer (2), and clamp (3) from valve cover (4). 3-6