TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 381 of 1396
TM 9-2320-366-20-3 CONTINUITY TEST (1) Remove circuit breaker CB10 from Power Distribution Panel (PD1). (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to one terminal of circuit breaker CB10. (4) Connect negative (-) probe of multimeter to other probe of circuit breaker CB10 and note reading on multimeter. (5) If continuity is not present, replace circuit breaker CB10 (para 20-80). (6) If continuity is present, perform Special Purpose Kit Troubleshooting task x1. No Power to Digitization Rack. Perform steps (7) through (10), if continuity is present through circuit breaker CB10. (7) Install circuit breaker CB10 in Power Distribution Panel (PD1) (8) Position electrical distribution block cover on power distribution shelf. (9) Tighten wing nut on electrical distribution block cover. (10) Install wing screw on power distribution shelf. NOTE All data on pages 2-2308 through 2-2371, including pages 2-2309 through 2-2370 deleted. Change 2 2-2307/(2-2308 Blank)