TM 9-2320-366-20-3 (1) Remove circuit breaker CB6 from Power Distribution Panel (PD1). (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to one terminal of circuit breaker CB6. (4) Connect negative (-) probe of multimeter to other probe of circuit breaker CB6 and note reading on multimeter. (5) If continuity is not present, replace circuit breaker CB6 (para 20-80). (6) If continuity is present, perform Special Purpose Kit Troubleshooting task x1. No Power to Digitization Rack. Perform steps (7) through (10), if continuity is present through circuit breaker CB6. (7) Install circuit breaker CB6 in Power Distribution Panel (PD1) (8) Position electrical distribution block cover on power distribution shelf. (9) Tighten wing nut on electrical distribution block cover. (10) Install wing screw on power distribution shelf. CONTINUITY TEST NOTE Change 2 2-2299