TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 369 of 1396
TM 9-2320-366-20-3  Change 2 2-2295  CONTINUITY TEST  (1) Remove circuit breaker CB7 from Power  Distribution Panel (PD1).  (2) Set multimeter to ohms.  (3) Connect positive (+) probe of multimeter to  one terminal of circuit breaker CB7.  (4) Connect negative (-) probe of multimeter to  other probe of circuit breaker CB7 and note  reading on multimeter.  (5) If continuity is not present, replace circuit  breaker CB7 (para 20-80).  (6) If continuity is present, perform Special  Purpose Kit Troubleshooting task x1. No  Power to Digitization Rack.  Perform steps (7) through (10), if  continuity is present through circuit  breaker CB7.  (7) Install circuit breaker CB7 in Power  Distribution Panel (PD1)  (8) Position electrical distribution block cover  on power distribution shelf.  (9) Tighten wing nut on electrical distribution  block cover.  (10) Install wing screw on power distribution  shelf.  NOTE