TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 263 of 1396
TM 9-2320-366-20-3 PRESSURE TEST Change 1 2-2230.5 (1) Position drain pan under suspension compression tee fitting. (2) Disconnect hydraulic hose 510 from suspension compression tee fitting LH output port. (3) Connect STE/ICE-R between hydraulic hose 510 and suspension compression tee fitting LH output port. (4) Start engine (TM 9-2320-366-10-1). (5) Position SUSPENSION knob to RAISE (TM 9-2320-366-10-1). (6) Position FUNCTION SELECT knob to SUSPENSION (TM 9-2320-366-10-1). (7) Push and hold PUMP plunger button (TM 9-2320-366-10-1) and perform STE/ICE-R Test #51. (8) If 2,500-4,000 psi (17,238-27,580 kPa) is not present, go to step 4 of this fault. (9) If 2,500-4,000 psi (17,238-27,580 kPa) is present, replace hydraulic hose 510 (para 19-12). (10) Disconnect STE/ICE-R from hydraulic hose 510 and suspension compression tee fitting LH output port. (11) Connect hydraulic hose 510 to suspension compression tee fitting LH output port. (12) Repeat steps (2) through (12) on hydraulic hose 508 and suspension compression tee fitting RH output port.