TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download

Page 1113 of 1396

TM 9-2320-366-20-3 7-79. M1084/M1086 CRANE POWER CONTROL CABLE ASSEMBLY REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Batteries disconnected (para 7-57). Kick panel removed (para 16-3). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Materials/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 20, Appendix D) Ties, Cable, Plastic (Item 69, Appendix D) Lockwasher (2) (Item 96, Appendix G) Washer, Spring (2) (Item 289, Appendix G) Washer, Spring (2) (Item 296, Appendix G) Nut, Self-Locking (19) (Item 154, Appendix G) a. Removal. (1) Disconnect connector P171 (1) from crane junction box connector (2). NOTE • Remove plastic cable ties as required. • Tag terminal lugs and connection points prior to disconnecting. (2) Remove screw (3), terminal lugs TL67 (4), TL17 (5), TL69 (6), and lockwasher (7) from left taillight carrier (8). Discard lockwasher. 7-357