TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download

Page 1076 of 1396

TM 9-2320-366-20-3 7-66. CAB CLEARANCE MARKER LIGHTS CABLE ASSEMBLY REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Batteries disconnected (para 7-57). PDP cover removed (para 16-2). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C) Socket Set, Socket Wrench (Item 34, Appendix C) Materials/Parts Lockwire (Item 30, Appendix D) Lockwasher (10) (Item 82, Appendix G) Lockwasher (2) (Item 88, Appendix G) Gasket (5) (Item 24, Appendix G) a. Removal. (1) Remove three screws (1) and washers (2) from PDP (3). (2) Remove three screws (4) from PDP (3). (3) Lift PDP (3) outward to gain access. (4) Remove two nuts (5), lockwashers (6), washers (7), and cover (8) from terminal board TB1 (9). Discard lockwashers. (5) Disconnect terminal lug TL74 (10) from terminal board TB1 (9) position 3. (6) Disconnect terminal lug TL86 (11) from terminal board TB2 (12) position 4. 7-320 Change 1