TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 1059 of 1396
TM 9-2320-366-20-3 7-62. M1093/M1094 CAB CLEARANCE AND MARKER LIGHTS LOWER CABLE ASSEMBLY REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Batteries disconnected (para 7-57). PDP cover removed (para 16-2). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-75 lb-in. (Item 90, Appendix B) Material/Parts Dispenser, Pressure Sensitive Adhesive Tape (Item 20, Appendix D) Lockwasher (2) (Item 88, Appendix G) a. Removal. (1) Remove three screws (1) and washers (2) from PDP (3). (2) Remove three screws (4) from PDP (3). (3) Lift PDP (3) outward to gain access. NOTE Tag wires and connection points prior to disconnecting. (4) Remove two nuts (5), lockwashers (6), washers (7), and cover (8) from terminal board TB1 (9). Discard lockwashers. (5) Disconnect terminal lug TL74 (10) from terminal board TB1 (9) position 3. (6) Disconnect terminal lug TL86 (11) from terminal board TB2 (12) position 4. 7-303