TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download

Page 1049 of 1396

TM 9-2320-366-20-3 7-59. CHEMICAL ALARM KIT CABLE ASSEMBLY REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Batteries disconnected (para 7-57). Kick panel removed (para 16-3). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Materials/Parts Ties, Cable, Plastic (Item 69, Appendix D) a. Removal. NOTE • Note routing of chemical alarm kit cable prior to removal. • Remove plastic cable ties as required. (1) Disconnect connector J99 (1) from connector P99 (2). (2) Remove chemical alarm kit cable assembly (3) from vehicle. b. Installation. NOTE Install plastic cable ties as required. Connect connector P99 (2) to connector J99 (1) and route chemical alarm kit cable assembly (3). c. Follow-On Maintenance. (1) Install kick panel (para 16-3). (2) Connect batteries (para 7-57). End of Task. 7-293