TM-9-2320-366-20-3 MTV Unit Maintenance Manual M1083 Series - Volume 3 Download
Page 1036 of 1396
TM 9-2320-366-20-3 7-56. BATTERY BOX REPLACEMENT This task covers: a. Removal b. Installation c. Follow-On Maintenance INITIAL SETUP Equipment Conditions Batteries removed (para 7-55). NATO power cable removed (para 7-70). Wet tank removed (para 23-12). Secondary and primary air tanks removed (para 11- 22). Tools and Special Tools Tool Kit, Genl Mech (Item 46, Appendix C) Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C) Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C) Drill, Portable, Electric (Item 7, Appendix C) Drill Set, Twist (Item 6, Appendix C) Goggles, Industrial (Item 15, Appendix C) Tool Kit, Blind Rivet (Item 74, Appendix C) Socket Set, Socket Wrench (Item 34, Appendix C) Wrench Set, Socket (Item 51, Appendix C) Tools and Special Tools (Cont) Wrench, Torque, 0-600 lb-ft (Item 60, Appendix C) Adapter, Socket Wrench (Item 1, Appendix C) Socket Set, Socket Wrench (Item 35, Appendix C) Materials/Parts Lockwasher (2) (Item 90, Appendix G) Nut, Self-Locking (4) (Item 161, Appendix G) Washer, Flat (10) (Item 279.1, Appendix G) Tape, Adhesive, Rubber (Item 65.2, Appendix D) Rivet, Blind (Item 254.1, Appendix G) Rivet, Blind (Item 254.2, Appendix G) Personnel Required (3) a. Removal. (1) Remove 16 nuts (1), screws (2), and 32 washers (3) from battery tray (4). (2) Remove battery tray (4) from battery box (5). (3) Deleted. WARNING Wear appropriate eye protection when removing rivets. Failure to comply may result in injury to personnel. (3.1) Remove six rivets (6), washers (6.1), and two latches (6.2) from battery box (5). (3.2) Remove six band clamps (6.3) from battery box (5). 7-282 Change 1