TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 771 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to (RH) connector P136-A or (LH) connector P135-A. (3) Connect negative (-) probe of multimeter to ground and note reading on multimeter. (4) If continuity is not present, repair wire 3065 (RH) or wire 3066 (LH) (para 2-45) or replace crane power cable assembly (para 7-79). (5) If continuity is present, replace crane worklight. (6) Connect connector P136 (RH) or P135 (LH) crane worklight connector. 2-1579/(2-1580 Blank) 2-1579/(2-1580 Blank) 2-1579/(2-1580 Blank) 2-1579/(2-1580 Blank) 2-1579/(2-1580 Blank)