TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 707 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1515 2-1515 2-1515 2-1515 2-1515 CONTINUITY TEST (1) Remove personnel heater to gain access (para 18-9). (2) Disconnect connector P912 from connector J912. (3) Set multimeter to ohms. (4) Connect positive (+) probe of multimeter to relay K15 socket 87A. (5) Connect negative (-) probe of multimeter to connector P912-15 and note reading on multimeter. (6) If continuity is not present, repair wire 1811 (para 2-45) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11). (7) Install relay K15 in PDP.