TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download

Page 693 of 1632

CONTINUITY TEST NOTE Use care when testing electrical connectors. Do not damage connector pins or sockets with multimeter probes. Failure to comply may result in damage to equipment. CAUTION Inspect connector pins/sockets for damage, corrosion, and serviceability. Check that connector pins are not pushed back and are capable of making good contact. TM 9-2320-366-20-2 Change 1 2-1502.5 (1) Install circuit breaker CB50 in PDP. (2) Install PDP cover on PDP (para 16-2). (3) Disconnect batteries (para 7-57). (4) Set multimeter to ohms. (5) Connect positive (+) probe of multimeter to connector P911 socket 3. (6) Connect negative (-) probe of multimeter to connector P909 socket 5 and note reading on multimeter. (7) If continuity is not present, repair wire 2006 from connector P911 socket 3 to (para 2-45) connector P909 socket 5 or replace auxiliary panel cable assembly (para 7-58). (8) Connect connector P911 to DUMP BED UP/ DOWN switch.