TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download

Page 635 of 1632

TM 9-2320-366-20-2 CONTINUITY TEST Change 1 2-1457 (1) Cut wire C from conductor splice at pneumatic solenoid L19. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter to terminal block TBC. (4) Connect negative (-) probe of multimeter to wire C and note reading on multimeter. (5) If continuity is not present, replace M1089 winch control wiring harness (para 7-142). (6) If continuity is present, replace 30K winch pneumatic manifold solenoid L19 (para 17-29). (7) Install circuit breaker CB50 in PDP. (8) Install PDP cover (para 16-2). (9) Install wrecker control panel top cover (para 14-4). (10) Close LH and RH catwalks.