TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download

Page 63 of 1632

CONTINUITY TEST CONTINUITY TEST (10) Connect negative (-) probe of multimeter to all other sockets on connector P113 and note reading on multimeter (11) If continuity not present is steps 3, 4, 6, 7, 9, and 10, go to step 20 of this fault. (12) If continuity present is steps 3, 4, 6, 7, 9, or 10, replace CTIS cable assembly (para 7-60). TM 9-2320-366-20-2 Change 2 2-958.11 (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to connector P110 socket j. (3) Connect negative (-) probe of multimeter to connector P113 socket A and note reading on multimeter. (4) If continuity is not present, replace CTIS cable assembly (para 7-60). (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter to connector P113 socket A. (3) Connect negative (-) probe of multimeter to known good ground and note reading on multimeter. (4) Connect negative (-) probe of multimeter to all other sockets on connector P113 and note reading on multimeter. (5) Connect positive (+) probe of multimeter to connector P113 socket B. (6) Connect negative (-) probe of multimeter to known good ground and note reading on multimeter. (7) Connect negative (-) probe of multimeter to all other sockets on connector P113 and note reading on multimeter. (8) Connect positive (+) probe of multimeter to connector P113 socket C. (9) Connect negative (-) probe of multimeter to known good ground and note reading on multimeter.