TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 589 of 1632
CONTINUITY TEST  TM 9-2320-366-20-2  Change 1 2-1450.11  (1) Set multimeter to ohms.  (2) Connect positive (+) probe of multimeter  to terminal block TBC(1).  (3) Connect negative (-) probe of multimeter to  to terminal block TBC(2) and note reading  on multimeter.  (4) Connect positive (+) probe of multimeter  to terminal block TBC(2).  (5) Connect negative (-) probe of multimeter to  to terminal block TBC(3) and note reading  on multimeter.  (6) Connect positive (+) probe of multimeter  to terminal block TBC(3).  (7) Connect negative (-) probe of multimeter to  to terminal block TBC(4) and note reading  on multimeter.  (8) Connect positive (+) probe of multimeter  to terminal block TBC(4).  (9) Connect negative (-) probe of multimeter to  to terminal block TBC(5) and note reading  on multimeter.  (10) If continuity is not present between two  terminal blocks noted above, replace  jumper wire between terminal blocks that  continuity is not present (para 7-33).  (11) If continuity is present, replace M1089  winch control wiring harness (para 7-142).  (12) Close LH and RH catwalks.  (13) Install circuit breaker CB50 in PDP.  (14) Install wrecker control panel top cover  (para 14-4).