TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 543 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2  2-1419 2-1419 2-1419 2-1419 2-1419  CONTINUITY TEST  CONTINUITY TEST  (1) Loosen four screws on junction box.  (2) Open cover on junction box.  (3) Disconnect overload lockout cable  connector from overload shutdown box.  (4) Set multimeter to ohms.  (5) Connect positive (+) probe of multimeter in  socket A of overload lockout cable  connector.  (6) Connect negative (-) probe of multimeter to  terminal board position 1 and note  reading on multimeter.  (7) If continuity is not present, replace overload  lockout cable (para 7-116).  (1) Set multimeter to ohms.  (2) Connect positive (+) probe of multimeter in  socket B of overload lockout cable  connector.  (3) Connect negative (-) probe of multimeter on  terminal board position 19 and note  reading on multimeter.  (4) If continuity is not present, replace overload  lockout cable (para 7-116).  (5) If continuity is present, perform Electrical  System Troubleshooting (e130. M1089  Hoist Up Lockout Does Not Activate, e131.  M1089 Boom Down Lockout Does  Not Activate, e132. M1089 Boom Up  Lockout Does Not Activate, and e133.  M1089 Telescope Out Lockout Does  Not Activate).  (6) Connect overload lockout cable connector  to overload shutdown box.  (7) Close cover on junction box.  (8) Tighten four screws on junction box.  (9) Connect batteries (para 7-57).