TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 537 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2  2-1413 2-1413 2-1413 2-1413 2-1413  CONTINUITY TEST  (1) Set multimeter to ohms.  (2) Connect positive (+) probe of multimeter on  contact two of boom up lockout solenoid  valve.  (3) Connect negative (-) probe of multimeter to  contact one of boom up lockout solenoid valve  and note reading on multimeter.  (4) If continuity is not present, notify DS  Maintenance.  (5) If continuity is present, notify DS Maintenance.  (6) Connect boom up lockout solenoid cable to  boom up lockout solenoid valve.  (7) Connect batteries (para 7-57).