TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 535 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2  2-1411 2-1411 2-1411 2-1411 2-1411  CONTINUITY TEST  CONTINUITY TEST  (1) Loosen four screws on junction box.  (2) Open cover on junction box.  (3) Disconnect boom up lockout solenoid cable  connector from boom up lockout solenoid  valve.  (4) Set multimeter to ohms.  (5) Connect positive (+) probe of multimeter in  socket 1 of boom up lockout solenoid cable.  (6) Connect negative (-) probe of multimeter to  terminal board position 19 and note reading  on multimeter.  (7) If continuity is not present, replace boom up  lockout solenoid cable (para 7-107).  (1) Set multimeter to ohms.  (2) Connect positive (+) probe of multimeter in  socket 2 of boom up lockout solenoid cable  connector.  (3) Connect negative (-) probe of multimeter on  ground in junction box and note reading  on multimeter.  (4) If continuity is not present, replace boom up  lockout solenoid cable (para 7-107).  (5) Connect boom up lockout solenoid cable  connector to boom up lockout solenoid valve.  (6) Close cover on junction box.  (7) Tighten four screws on junction box cover.