TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 527 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2  2-1403 2-1403 2-1403 2-1403 2-1403  CONTINUITY TEST  CONTINUITY TEST  (1) Loosen four screws on junction box.  (2) Open cover on junction box.  (3) Disconnect hoist up lockout solenoid cable  connector from hoist up lockout solenoid.  (4) Set multimeter to ohms.  (5) Connect positive (+) probe of multimeter in  socket 1 of hoist up lockout solenoid  cable.  (6) Connect negative (-) probe of multimeter to  terminal board position 19 and note  reading on multimeter.  (7) If continuity is not present, replace hoist up  lockout solenoid cable (para 7-112).  (1) Set multimeter to ohms.  (2) Connect positive (+) probe of multimeter in  socket 2 of hoist up lockout solenoid  cable connector.  (3) Connect negative (-) probe of multimeter on  ground in junction box and note reading  on multimeter.  (4) If continuity is not present, replace hoist up  lockout solenoid cable (para 7-112).  (5) Connect hoist up lockout solenoid  cable connector to hoist up lockout  solenoid valve.  (6) Close cover on junction box.  (7) Tighten four screws on junction box  cover.