TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download

Page 445 of 1632

TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1321 2-1321 2-1321 2-1321 2-1321 CONTINUITY TEST (1) Disconnect hoist down solenoid connector from hoist down solenoid. (2) Set multimeter to ohms. (3) Connect positive (+) probe of multimeter on pin 2 of hoist down solenoid cable connector. (4) Connect negative (-) probe of multimeter on ground and note reading on multimeter. (5) Connect positive (+) probe of multimeter on pin 1 of hoist down solenoid cable connector. (6) Connect negative (-) probe of multimeter on terminal board lower position 24 and note reading on multimeter. (7) If continuity is not present, replace hoist down solenoid cable (para 7-111). (8) If continuity is present, notify DS Maintenance. (9) Connect hoist down solenoid cable connector to hoist down solenoid. (10) Close cover on junction box. (11) Tighten four screws on junction box cover. (12) Stow crane (TM 9-2320-366-10-1).