TM-9-2320-366-20-2 MTV Unit Maintenance Manual M1083 Series - Volume 2 Download
Page 411 of 1632
TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 TM 9-2320-366-20-2 2-1287 2-1287 2-1287 2-1287 2-1287 CONTINUITY TEST (1) Set multimeter to ohms. (2) Connect positive (+) probe of multimeter on contact two of boom up lockout solenoid valve. (3) Connect negative (-) probe of multimeter to contact one of boom up lockout solenoid valve and note reading on multimeter. (4) If continuity is not present, notify DS Maintenance. (5) If continuity is present, notify DS Maintenance. (6) Connect boom up lockout solenoid cable to boom up lockout solenoid valve. (7) Connect batteries (para 7-57).